Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008 行业发展趋势

市场调研网 > 能源矿产行业 > Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

报告编号:0251819  繁体中文  字号:   下载简版
  • 名 称:Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008
  • 编 号:0251819←咨询时,请说明该编号。
  • 市场价:纸质+电子版13500
  • 优惠价:电子版10800元  纸质+电子版11100可提供增值税专用发票
  • 电 话:400-612-8668、010-66181099、66182099、66183099
  • 邮 箱:kf@20087.com  下载《订购协议》
  • 提 示:如需英文版、日文版等其他语言版本,请向客服咨询。
  • 网上订购 下载协议 下载简版
Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

内容介绍:

  In 2006, the gross generated energy in China has reached 2755.7 billion KWH, which has increased by 13.67% as compared with 2005, while the generated energy of hydropower has reached 378.3 billion KWH, which has increased by 3.50% as compared with the same period last year. The proportion of hydropower in the gross generated energy was 13.7% in 2006, which has dropped by 1.5% than 2005. The pace of construction of hydropower station is evidently behind with the average progress of power construction all over the country. The total amount of new generating sets put into service in 2006 was 101,170 MW, which has exceeded the generally prospected amount of 90,000 MW. The gross installed generating capacity at the end of 2006 has reached 622,000 MW that has increased by 20.3% as compared with the same period of last year, which has hit an all-time high in the annual growth. As for the composition of power source, the percentage of thermal power was 77.8 % that has increased by 2.1 percentage points; the percentage of hydropower was 20.7 %, which has dropped by 2.0 percentage points, and this was the result of pursuing the improvement of supply capability steadily and fast in a short time under the condition of electric power shortage. The average exploitation level of hydropower in developed countries is above 60%. Among the countries, the percentage of exploited hydroelectric resource is about 82% in the USA, 84% in Japan and 65% in Canada. Comparing with these countries, the hydroelectric development in our country is still at a comparatively low level, and still has great development potential.

  At present, the installed generation capacity of hydropower all over the world is about 800 million KW, which meets 20% of the global electricity requirement. The development and utilization of hydro energy resource has made significant contributions for the human civilization and social progress. China is relatively rich in Hydro energy resource, of which the installed generation capacity available for exploitation exceeds 400 million KW, and the annual energy output is more than 1700 billion KWH, so hydro energy resource is an important energy resource in China. The potential hydropower resource in our country comes first in the world. In accordance with the re-check result of hydropower resource in 2003, the amount of rivers of which the potential hydro energy is above 1,000 KW was 33,886 in our country (mainland). The theoretical potential hydropower resource was 6080 billion KWH of annual quantity of electricity with an average power of 694 million KW, which makes up about 1/6 of the quantity of electricity all over the world. The 542 million KW of technical development capacity available has made up 78.1% of the average power, and the 2470 billion KWH of annual energy output has made up 40.6 % of theoretical potential quantity of electricity. Therefore, the development of hydropower industry in our country has a great geographical advantage.

  Emphasize on the exploitation of resources in the west part of China. According to the relevant information, the amount of hydropower resource available for development and utilization in our country can reach 37.8 billion KW, which come first in the world. Southwest China is very rich in hydropower resource, and 68% of the total amount of hydropower resource available for exploitation concentrates in this region, of which the ratio of resource developed and used is less than 10% now. The exploitation of hydropower resource in the southwest may promote the development of the relevant industries of communication, cement, steel product, electromechanical etc. The positive and steady implementation of the plan of ";Transport the Electricity from the West to the East"; may optimize the power utilization structure in the East and improve the regional ecological environment, while offering the electricity required by the development of the East.

  In accordance with the preliminary planning, by the year of 2020, the amount of installed generation capacity of hydropower all over the country will reach 270 million KW, which accounts for 29% of the installed gross capacity of electric power, and the hydroelectric development level will reach 68%. The the direct benefit of power generation is equivalent to the saving of 420 million ton of standard coal equivalent. The reduction is 1.17 billion ton of CO2, 7.5 million ton of sulfur dioxide and other kinds of harmful gas. It will play an important role in the reduction of global air pollution and greenhouse effect and makes great environmental benefit. Hydropower construction may also take account of the comprehensive benefit of flood prevention, irrigation and transportation etc, and at the same time, it also will make the social benefit of the promotion of economic growth and social development, and the poverty alleviation. Therefore, the hydropower industry has a great long-term potential and is favored by lots of investment institutions.

  Chapter 1 Situation of China Hydropower Resources

  Section 1 General Situation of China Hydro-energy Resources

  I. Reserves and Distribution of China’s Hydro-energy resources

  II. Characteristics of China’s Hydro-energy resources

  Section 2 Utilization Status of China’s Hydro-energy Resources

  I. General Application

  II. Twelve Hydropower Bases

  III. Hot spot Area Analysis on Current China’s Hydropower

  Resources Development

  IV. The principal problems

  Chapter 2 Hydro-energy Resources and Application of China’s Main Rivers

  Section 1 Changjiang River Basin

  I. General Situation

  II. Analysis on upper hydro-energy resource and development

  III. Analysis on middle hydro-energy resource and development

  Section 2 Rivers in Southwest

  I. Analysis on hydro-energy resource and utilization of Nujiang River

  II. Analysis on Hydro-energy Resource and Utilization Lancangjiang River

  III. Analysis on hydro-energy resource and utilization of Dulong River

阅读全文:https://www.20087.com/2007-06/R_eportontheurveyandtheorecastofnvestmBaoGao.html

  IV. Analysis on hydro-energy resource and utilization of Yarlung Zangbo River

  Section 3 Yellow River Basin

  I. General Situation

  II. Analysis on hydro-energy resource and development of Yellow River upstream

  III. Main Problems and Measure during the development of

  hydro-power in the upstream of Yellow River

  IV. Analysis on hydro-energy resource and development of

  middle stream of Yellow River

  V. Hydropower Development Plan of Yellow River upper and middle stream

  VI. Forecast of Develoment of Yellow River Hydropower

  Section 4 Pearl River Basin

  I. General Situation

  II. Analysis on hydro-energy resource and development of

  main branches of Pearl River

  III. Hydropower Development Plan

  Section 5 Rivers along Southeast Coast

  I. General Situation

  II. Analysis on hydro-energy resource and development of Main Branches

  Section 6 Development and Utilization of Hailuan River Hydro-energy Resources

  Section 7 Development and Utilization of Huai River Basin Hydro-energy Resources

  Section 8 Rivers in Northeast China

  is on hydropower resource and development of Heilongjiang river system

  II. Analysis on hydropower resource and development of Tumen River system

  III. Analysis on hydropower resource and development of Yalu river system

  IV. Analysis on hydropower resource and development of Liaohe river system

  Chapter 3 Status and Trend of Global Hydropower Industry

  Section 1 Distribution and Utilization of Global Hydropower Resources

  I. General Development

  II. Europe

  III. North America

  IV. Asia

  Section 2 Analysis on Global Hydropower Development

  Section 3 Successful Experience and Revelation of Gloabal Hydropower Industry

  Section 4 Main Problems in the Development of Global Hydropower Industry

  Section 5 Forecast of Development Trend of Global Hydropower Industry

  Chapter 4 Analysis on Development Environment of China’s Hydropower

  Industry during 2007-

  Section 1 Influence of Power Industry Policy on its Development

  I. Development Plan of Power Industry during the period of ”Eleventh Five-year Plan”

  II. Analysis on the development of hydropower industry affected by

  “Transport the Electricity from the West to the East” strategy

  III. Analysis on financing and investment in hydropower industry.

  IV. Analysis on Tax policy of hydropower Industry

  V. Change of foreign investment policy on hydropower in post-WTO

  VI. Forecast on key development areas and restructure of hydropower

  Section 2 Influence of Environment Protection Policy on the

Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

  Development of Hydropower Industry

  I. Influence of United Nations Framework Convention on Climate

  Change on the hydropower development

  II. The influence of Law of Environmental Impact Assessment on

  hydropower development in our country

  III. The influence of Environmental Protection Act of Construction

  Item to Hydropower development

  Section 3 Influence of River Water on the Development of Hydropower

  Power Industry

  I. The Analysis on the stability of hydrologic records of main rivers in China

  II. Main ways to maintain the stability of hydropower water supply

  Chapter 5 Analysis and Research on Policies and System Refomr of

  Hydropower Industry

  Section 1 Relevant Industry Policy for the Development of Hydropower

  I. Transmission from active development to orderly development

  II. Analysis on the draft plan of China's power during the

  period of "Eleventh Five-year Plan"

  III. " Notice on accelerating the restructuring of the electric

  power industry, promote the healthy and orderly development”

  IV. Implementation of "renewable energy Law”

  V. Power planning throughout China

  Section 2 Analysis on Electric Power System Reform

  I. System reform policy of China's electric power

  II. Electric power system reform of foreign countries as reference

  Section 3 Outlook of China's Hydropower Industry-Related Policy duiring 2007-

  Chapter 6 Analysis on the Overall Operation of China's Hydropower Industry in

  Section 1 Analysis on Overall China's Hydropower Industry

  Section 2 Status of Hydropower in China’s Energy System

  Section 3 Characteristics of China's Hydropower Industry

  I. Big investment, long period of construction

  II. Long-term benefits, and the short-term poor benefits, slow recovery of funds

  III. Natural and seasonal influence

  IV. Uneven distribution of water and electricity, more in the west, less in the east

  Section 4 Main Problems of China's Hydropower Industry

  I. Slow process of hydropower industry

  II. Grid construction is lagging behind, restricting the

  development of domestic hydroelectric industries

  III. The formation of price control mechanism restricts

  development of hydropower industry

  Chapter 7 Analysis on Production Ability of China’s

  Hydropower Industry during 2007-

  Section 1 Analysis on Production of Hydropower Industry in

  Section 2 Analysis on Installed Capacity of China’s

Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

  Hydropower Changes during 2007-

  Section 3 Analysis on the Changes of China Hydropower

  Generation during 2007-

  Section 4 Analysis on Hydropower Production during 2007-

  I. Index of General Economic Operation

  II. Analysis on Hydropower Production in Different Area

  III. Analysis on different ownership enterprises

  IV. Annalysis on enterprises with different scale

  Section 5 Main Problems in Hydropower Generation in China

  Chapter 8 Forecast and Analysis on Supply and Demand in China’s

  Hydropower Market during 2007-

  Section 1 Forecast and Analysis on Market Demand in China’s Hydropower

  Market during 2007-

  I. Analysis on development trend of power consumption

  II. Analysis on China’s power demand

  Section 2 Forecast and Analysis on Non-water Electric Power in China during 2007-

  I. Analysis on thermal power supply

  II. Analysis on nuclear power supply

  III. Analysis and Forecast of Wind Power Supply

  IV. Analysis and Forecast of Gas power supply

  V. Analysis on thermal power, nuclear power, wind power and gas power

  generation projects

  VI. Analysis on supply and demand of Non-hydropower

  Section 3 Forecasts of China's Demand for Hydropower Market during 2007-

  Chapter 9 Analysis on Sales Channel and Marketing Modes of China's

  Hydropower during 2007-

  Section 1 Analysis on Sales Channels of Current Hydropower

  Section 2 Comparative Analysis on Advantages and Disadvantages of Major

  Client’s Direct Electricity and Bidding

  Section 3 Relations between Differentiated Pricing and Bidding

  I. Grid price difference between Hydropower and thermal power

  II. Price difference among the hydro-electricity in different regions

  Section 4 Analysis on Trading Patterns of Different Types of Hydropower

  ower station with Comprehensive Utilization mainly and balance generating

  II. Stations integrating power generation, flood control, shipping

  III. Runoff - Hydropower Station

  IV. Hydropower stations with regulatory functions over the quarter

  V. Cascade Hydropower

  Section 5 Analysis on Diversification Trend of Hydropower Sales

  Section 6 Discussion on the Hydropower onto-grid Discrimination

  of private Grid utilities and foreign enterprises

  II. China's hydropower Grid policies

  III. The main problems of Chinese private and foreign investment

  in hydropower Grid

  IV. Whether discrimination exists in Grid

report on the survey and the forecast of investment prospect of hydropower industry in china during 2007 and 2008

  Chapter 10 Analysis on China’s Hydropower onto-grid Price

  Competition during 2007-

  Section 1 Analysis on China’s Electricity Price reform

  Section 2 Analysis on China's Power Bidding Status

  Section 3 Comparision of Costs among Main Power Sources in China

  I. Cost of Thermal Power

  II. Generation Cost of Hydropower

  III. Generation Cost of Nuclear Power

  IV. Generation Cost of Wind Power

  V. Generation Cost of Solar Power

  Section 4 Competitive Advantage of China's Hydropower Onto-grid Prices

  Section 5 Development Trend of China's Hydropower Bidding

  Chapter 11 Forecast of China’s Hydropower Equipment Industry during 2007-

  Section 1 Analysis on Hydropower Equipment Market

  I. Analysis on electrical equipment production growth

  II. Production of power generating equipment

  Section 2 Development Opportunities of Hydropower Equipment Market

  I. Forecast of Demand for Generating Equipment at home and abroad

  II. Grid planning

  Section 3 Forecast and Trend of Hydropower Equipment Industry

  Chapter 12 Analysis on China Constructing and Planning Hydropower

  Projects Scale during 2007-

  Section 1 Scale of China's Hydropower

  Section 2 Proposed Scale of China's Hydropower during 2007-

  Section 3 Analysis on Installed Capacity of China’s Hydropower during2007-

  Chapter 13 Forecast and Analysis on the Competition in China's Hydropower

  Industry during 2007-

  Section 1 Overall Pattern of Competition among China Hydropower Industry

  I. Original "five power companies" further strengthen hydropower

  II. Huge State-owned Enterprises have brought an enormous amount of

  money into the electricity

  III. Central Electricity Generation’s merger with local hydropower

  enterprises have become the trend

  IV. Hydropower Development accelerates

  Section 2 Analysis on Competitive Groups in China’s Hydropower Industry

  I. Classification of Competitive Groups in China’s Hydropower Industry

  II. SWOT

  Section 3 Forecast of Competition in China's Hydropower Industry

  I. Inevitable inter-regional expansion of large enterprises generating

  -cost advantages of hydropower is gradually emerging

  IV. SHP investment prospect

  V. Foreign and private capital enter the hydropower sector investment

  VI. Integrated energy companies will become the trend within the

  next decade

  Chapter 14 Analysis on Regional Development of China's Hydropower

2007年と2008年の間に調査中国における水力発電産業の投資展望の予測に関する報告書

  Industry during 2007-

  Section 1 Analysis on Sichuan Hydropower Development

  I. Water resource and development of Sichuan

  II. Sichuan hydropower development and investment policy

  III. Sichuan Constructing and Planning Hydropower Projects

  IV. Sichuan main rivers with much developed value

  V. Sichuanhydropower industry development trend

  Section 2 Analysis on Hydropower Development in Yunnan

  I. Yunnan water resources and development situation

  II. Yunnan hydropower development and investment policy

  III. Yunnan Constructing and Planning Hydropower Projects

  IV. Yunnan main rivers with much developed value

  V. Yunnan hydropower industry development trend

  Section 3 Analysis on Guizhou Hydropower Development

  I. Guizhou water resources and development situation

  II. Guizhou Constructing and Planning Hydropower Projects

  III. Guizhou main rivers with much developed value

  IV. Development trend of Guizhou hydropower industry

  Section 4 Analysis on Guangxi Hydropower Development

  I. Guangxi water resources and development situation

  II. Guangxi hydropower development and investment policy

  III. Guangxi Constructing and Planning Hydropower Projects

  IV. Main rivers with much developed value in Guangxi

  1. Xijiang river system

  Section 5 Analysis on Hubei Hydropower Development

1 2 下一页 »

Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

订阅《Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008》,编号:0251819
请拨打:400-612-8668、010-66181099、66182099、66183099 Email:Kf@20087.com

二维码

  • Report on the Survey and the Forecast of Investment Prospect of Hydropower Industry in China during 2007 and 2008

订阅流程

    浏览记录

      合作客户